proumb性欧美在线观看-亚洲真人无码永久在线-四虎成人精品-一本岛高清乱码2020叶美-成年女人男人免费视频播放-图片区小说区av区-欧美一区二区日韩-免费黄色网址大全-色女人在线-国产欧美综合在线观看第十页

News

Drilling of Hilong’s Comprehensive Technical Service Well Rajani-5 Starts

Date 2016-03-23

(March 23, 2016, Shanghai) Hilong Oil Service & Engineering Pakistan (Private) Ltd. successfully started an integrated service project to drill well Rajani-5 on March 21, 2016, with drilling fluid, directional drilling and bits services.
 

The designed TD of Rajani-5 is over 14000ft, estimated bottom hole temperature(BHT) is as high as 170℃, the highest mud weight is as high as 14ppg. It is a rare deep and high-temperature well in Rajani block, giving extreme difficulty to drill.
 

Hilong introduced UEPL with customized solutions of drilling fluid, directional drilling and bits in the 2nd half of 2015. After a number of technical exchanges and business trip to Hilong, UEPL released PO to Hilong to provide integrated service of well Rajani-5.

 

Dai Daliang, senior vice president of Hilong Group and general manager of Oil Service Business said, “the Rajani-5 well is the first oversea integrated oil service project of Hilong, marking a big step forward on the part of Hilong towards becoming an integrated oil service supplier.”

The Site of the Rajani-5 Well